论文部分内容阅读
浙江舟山渔场指挥部党委紧紧抓住当前春汛的准备工作,于一月十九日召开各公社党委书记会议,研究春汛准备。会议提出:今年春汛出海的单位和劳力必须比去年多,并尽可能扩大远洋作业,缩小近洋作业,当前春汛准备工作着重抓三条:(1)抓劳力、技术和工具调配,以增加生产单位,扩大春汛生产队伍;(2)抓技术革命,推广综合染网法,吕泗洋抛椗张网及野鸡头蓬和小网改大网等项目,同时结合改进劳动组织,减少煨船人员,增加网船人员,以减轻网船人员的劳动强度,增加出网次数,保证增产。此外,还要求各个公社,尽可能在春汛吕泗洋生产中,
Zhejiang Zhoushan Fisheries Command Party Committee firmly grasp the current preparations for the spring flood, January 19 meeting held in the commune party secretary to study the preparation for the flood season. The meeting said: The units and labor force going to sea for this spring flood season must be more than last year, and as far as possible to expand ocean-going operations and reduce the cost of near-ocean operations. The current preparatory work for flood control focuses on three areas: (1) allocate labor, technology and tools to increase production units , Expand the production team of spring flood; (2) grasping the technical revolution, promoting the comprehensive dyeing method, Lu Siyang throwing nets and pheasant Peng Peng and small nets to change the network and other projects, combined with improving labor organization, reduce the number of simmer vessels, Ship crew, in order to reduce the labor intensity of net boat personnel, increase the number of outbound, to ensure that the increase. In addition, various communes were also required to, as far as possible in the production of Lu Siyang in the flood season,