论文部分内容阅读
目的评价某化工厂建设项目职业病危害控制措施的效果。方法采用检查表法和检测检验法进行定性和定量评估。结果建设项目的建设地点、总体布局、生产工艺及设备布局、卫生工程技术措施、个人防护措施、应急救援措施、辅助卫生用室设置符合标准、规范要求。结论该项目已具备职业卫生竣工验收条件。
Objective To evaluate the effect of occupational hazards control measures in a chemical plant construction project. Methods Checklist and test methods were used for qualitative and quantitative evaluation. Results The construction site, overall layout, production technology and equipment layout, sanitary engineering technical measures, personal protective measures, emergency rescue measures and auxiliary health room settings met the standards and norms. Conclusion The project already has the condition of acceptance of occupational health completion.