论文部分内容阅读
工程名称:春天自助烤肉(贵都店)坐落地点:山西太原面积:1800 m2设计单位:RYB肖可可设计事务所设计顾问:肖可可参与设计:马霄龙乐乐竣工时间:2015.05摄影:刘育麟1863年1月10日,世界第一条地铁伦敦地铁运行。它是工业时代变革发展的重要标志之一,它也成为伦敦这座城市历史文化中不可或缺的一部分。本案之所以取材于此,是因为空间高度和环境与地铁环境的契合度激发了设计创作灵感。通过叙事的形式还原那个年代的历史、
Project Name: Spring Barbecue (Guidu Branch) Location: Taiyuan, Shanxi Area: 1800 m2 Design by: RYB Xiao Keke Design Office Design Consultant: Xiao Keke Design: Maliao Long Lele Completion: 2015.05 Photography: Liu Yulin 1863 January 10, the world’s first underground London subway operation. It is one of the most important symbols of change and development in the industrial age and it has also become an integral part of the city’s history and culture. The reason why this case is based on this is that the space height and the fit between the environment and the subway environment have inspired the design creation. Restore the history of that era through narratives,