伦敦维多利亚车站新的旅客信息显示系统于1988年8月投入运用。该系统有两块主要的信息揭示板,采用液晶显示,活页揭示装置,互联电视监控器。由一个控制室掌握全部作业。这项170万英镑的合同由英国 Cartner工程公司中标。控制室设有两座控制台,在高峰期和紧急情况下,两台同时使用,平时只用一台。有关列车运行的各种变化情况,经过直观显示装置、电话和电传打字机报送给控制台操作人员。据此,操作人员使用键盘更改活页显示器上的显示或将信息在液晶显示器上予以显示。
New passenger information display system at London’s Victoria Station was put into operation in August 1988. The system has two main information revealing panels, using a liquid crystal display, a loose leaf revealing device and an internet television monitor. From a control room to master all the work. The £ 1.7 million contract was won by Cartner Engineering UK. Control room has two consoles, at peak and emergency situations, two at the same time, usually only one. Various changes to the operation of the train are reported to console operators via visual display devices, telephones and teletypewriters. Accordingly, the operator uses the keyboard to change the display on the living display or to display the information on the liquid crystal display.