论文部分内容阅读
水电是电力生产的第二大组成部分,相对于火电而言,水电是可再生能源,具有环保效益高、无有害气体以及烟尘和灰渣,发电效率高、发电成本低廉等方面的优势,是理想的发电模式。锦屏水电站包括锦屏一级、二级水电站,共同组成了锦屏“双子星座”电站,被认为是国内乃至世界上施工布置难度最大、建设管理难度最大、工程技术难度最大、施工环境最危险的巨型水电站之一。锦屏水电站自动化控制系统主要包括水轮发电机组监控系统、开关站控制系统、水电站公用设备控制系统、水电站闸门自动控制系统等。通过开放、模块化的结构设计,实现对水电站生产过程的监视、
Hydropower is the second largest component of power generation. Compared to thermal power, hydropower is a renewable energy source. It has the advantages of high environmental benefits, no harmful gases, dust and ash, high power generation efficiency and low generation cost Ideal power generation mode. Jinping hydropower station, including Jinping level, two hydropower stations, jointly formed Jinping Gemini "power station, is considered to be the construction of domestic and even the world’s most difficult construction, construction and management of the most difficult, the most difficult engineering and construction environment One of the most dangerous giant hydro plants. Jinping hydropower station automation and control systems include hydroelectric generator monitoring system, switch station control system, hydropower station public equipment control system, hydropower station gate automatic control system. Through the open, modular structure design, to achieve the monitoring of the hydropower station production process,