本文根据华能南京电厂2×300MW工程实践体会,从挖掘现有场地潜力、寻找新的场地资源、革新施工工艺等角度叙述了节省和合理使用锅炉组合场地的措施。
Based on the 2×300MW engineering experience of Huaneng Nanjing Power Plant, this article describes the measures to save and rationally use the boiler assembly site from the perspectives of excavating the existing site potential, finding new site resources, and innovating the construction technology.