论文部分内容阅读
1991年7月15日,被告某建筑公司与某体委体工大队签订了《建筑安装工程承包合同》,由被告为体工队建筑宿舍楼。同时双方签订了《工程贷款补充协议书》,规定:“体工队兴建宿舍楼因资金暂时有缺口,建筑公司(被告)为使工程能顺利开工,按期完工,除无息垫付20万工程款外,需向建行贷款50万元。施工期间,其贷款利息按4∶6分摊(即体工队负担30万元,建筑公司负担20万元,
July 15, 1991, the defendant, a construction company and a body commission brigade signed a “construction and installation contract,” the defendant for the construction of the dormitory building. At the same time, the two sides signed the Supplementary Agreement on Engineering Loans, which stipulates: "For construction workers’ dormitories, due to the temporary shortage of funds, construction companies (defendants), in order to make the project start smoothly and be completed on schedule, pay off 200,000 engineering funds In addition, 500,000 yuan should be lent to China Construction Bank during the construction period, and the loan interest will be distributed at 4: 6 (that is, the construction team will bear 300,000 yuan, the construction company will pay 200,000 yuan,