注水开发的油田,在自喷开采的条件下,随着开采时间的增长,原油产量和含水率将不断地发生变化。按照注采平衡的原则,注水量也应随着变化。考虑到注水设备的能力和管网系统应满足最大注水量的要求,预测最大注水量及其出现时期,对经济地规划注水站的规模和布局,设计注水管网系统是十分必要的。为了保持注采平衡,注入水的体积应等于从油层中采出来的油和水的体积之和,即:
Waterflooding oilfields, under conditions of self-blasting, will continue to produce changes in crude oil production and moisture content as mining times increase. In accordance with the principle of injection and production balance, the amount of water should also change. Taking into account the capacity of water injection equipment and pipe network system should meet the maximum water injection requirements, predict the maximum water injection and its emergence period, the economic planning of the scale and layout of water injection stations, the design of water pipe network system is necessary. In order to keep balance between injection and injection, the volume of water injected should be equal to the sum of the volumes of oil and water produced from the reservoir, that is: