论文部分内容阅读
章水中上游干流水电梯级工程规划由红石桥水库、油罗口水库和峡口电站组成,开发目标以防洪、灌溉兼有发电为主。本文试就该水电梯级工程开发对环境的可能影响进行分析评价。一、工程规划概况章水流域地处江西省赣州地区西南部,东经114°至114°55′,北纬25°15′至25°45′。章水是章江的主要支流,发源于崇义聂都山,流经大余县和南康县东南部,在南康三江口汇纳上犹江后称章江,至赣州市与贡江汇合成赣江。章水主流全长177公里,流域面积2824平方公里。干流在油罗口水库以上称上
The planning of the hydropower cascade project in the upper and middle reaches of Zhangshui is composed of Hongshijingqiao Reservoir, Youluokou Reservoir and Xiakoukou Hydropower Station. The targets of development are flood control and irrigation with both power generation and power generation. This paper tries to analyze and evaluate the potential impact of the hydropower development on the environment. I. Overview of Project Planning Zhangshui River Valley is located in the southwestern part of Ganzhou in Jiangxi Province, with longitude 114 ° to 114 ° 55 ’east longitude and latitude 25 ° 15’ to 25 ° 45 ’north latitude. Zhang Shui is the main tributary of Zhangjiang River, originated in Chongyi Niedu Mountain, flows through Dayu County and Nankang County in southeastern China. Ganjiang. Zhang Shui mainstream length of 177 km, the basin area of 2824 square kilometers. The main stream is above the oil LuoKou reservoir