海流沟加工系统主要承担大坝、电站进水口等工程混凝土及喷混凝土体型结构工程量,共需生产粗、细成品骨料约840万t。本文主要就料场毛料开采、加工系统砂石骨料生产控制、试验监控和成品销售质量控制四大部分的质量控制进行阐述。
The Hai Lugou processing system is mainly responsible for engineering works such as dams and power station intakes and the volume of sprayed concrete body structures, with a total production of about 8.4 million t of coarse and fine finished aggregates. This article mainly elaborates the quality control of the four major parts in the field of raw materials wool production, processing and gravel aggregate production control, test monitoring and finished product sales quality control.