论文部分内容阅读
近年来,为从根本上解决水资源严重缺乏的问题,我们实施了大批的农田节水灌溉工程,在节水模式的选择、材料设备的选取等方面作了大量的改革与创新,有效地降低了工程施工难度,解决了因地面高差较大,地形起伏变化造成的农田无法灌溉和灌溉难的问题,确保了节水工程的建设质量,为其长期发挥效益奠定了坚实的基础。但由于运行管理体制不够健全,也有部分节水工程的管理使用不尽如人意,造成工程效益不能正常发挥,使用年限缩短,工程的投入产出比例远远达不到设计标准。根据目前我市节水灌溉工程的运行管理情况,分析探讨了工程在运行管理过程中存在的主要问题,并提出了相应的改进措施与建议。
In recent years, in order to fundamentally solve the problem of a serious shortage of water resources, we implemented a large number of farmland water-saving irrigation projects and made a lot of reforms and innovations in the selection of water-saving modes and the selection of materials and equipment so as to effectively reduce The difficulty of construction, to solve the problem of difficult to irrigate and irrigate farmland caused by large ground height difference and undulating topography, to ensure the construction quality of water-saving project and lay a solid foundation for its long-term benefits. However, due to the imperfect operation and management system and the unsatisfactory management of some water-saving projects, the project benefits can not be brought into full play and the service life is shortened. The proportion of input-output of the projects falls far short of the design standards. According to the current operation and management of water-saving irrigation project in our city, the main problems in the operation and management of the project are analyzed and discussed, and the corresponding improvement measures and suggestions are put forward.