论文部分内容阅读
一、概述爬模工艺是在滑模和大模板工艺基础上发展起来的一种先进工艺,即现浇混凝土在固定模板内,模板在混凝土硬化到一定强度后拆离并脱离墙面向上爬升,逐段浇筑逐段爬升。爬模工艺的模板可以自动爬升,体现了滑模工艺的优点;选用整装大模板,体现了大模板工艺的优点。操作简便,施工安全可靠,由于可以逐层调整,垂直度易于得到控制。在高层框剪结构施工中,以爬模工艺为主,飞
I. Overview The climbing moulding process is an advanced technology developed on the basis of slipform and large formwork technology. In-situ concrete is in the fixed formwork. The formwork is detached from the wall after the concrete hardens to a certain strength and climbs upwards. Stage by piece to climb by paragraph. The template of the climbing moulding process can be automatically climbed, embodying the advantages of the sliding mode process; the selection of a full mounting template reflects the advantages of the large formwork process. The operation is simple and the construction is safe and reliable. Because it can be adjusted layer by layer, the verticality is easily controlled. In the construction of high-rise frame-shear structure, the main technique is to climb