论文部分内容阅读
The HIRFL-CSR vacuum system progressed steadily during the past year. The 2/3rd of CSR, injection beam line (SSC-CSR, m)'s vacuum chambers were installed in site in Jan. 2003 (Fig.l). The beam diagnostic devices were inserted in the chambers as well.