论文部分内容阅读
山西中南部铁路通道概况山西中南部铁路通道起自山西省吕梁市兴县瓦塘镇,向南经山西省中南部,穿越吕梁山向东,横贯晋豫鲁三省,止于山东省日照市日照港,全长1 269.836 km该铁路2010年7月幵工建设,2014年12月建成通车。这一重载铁路能显著提高山西中南部地区煤炭外运能力,是石太一石德一胶济铁路、长邯一邯济一胶济铁路、侯月一新菏一兖日铁路之间一条新的“西煤东运”能源运输大动脉。山西中南部铁路通道按照国铁1级标准建设,是我国第一条设计轴重30 t的双线电气化自动闭塞
Central and Southern Shanxi Railway Corridor Overview Central South Railway Shanxi Province from Lvliang Xingxian Watang Town, south through the central and southern Shanxi Province, across the Lvliangshan east, across the Shandong and Shandong provinces, only in Rizhao City, Shandong Province Rizhao Hong Kong, total length 1 269.836 km The railway started construction in July 2010 and was opened to traffic in December 2014. This heavy haul railway can significantly improve the ability of coal transportation in southern central Shanxi Province. It is a new bridge between Shijiazhuang-Shijiazhuang-Shijiazhuang-Jiaozhou-Jinan Railway, Longhan-Jinan-Jinan Railway, “West Coal East Transport ” energy transport artery. Central South Railway Station in accordance with the national railway level 1 standard construction, is China’s first design axle load 30 t double-wire electrification of automatic block