一、白面石武水大桥概况白面石武水大桥位于衡广复线铁路DK1980+150米处,距著名的大瑶山隧道进口约8公里,横跨珠江水系北江支流——武水。全桥总长为273.80米,双线有碴桥面,其中主跨为长129.1米的预应力混凝土连续梁。跨度由32+64+32米组成,截面为三腹板的单箱双室(见图1)。梁体为变高度,中支点处梁高为5米,端支点及跨中处梁高为3 First, the white stone Wu Shui Bridge Overview White stone Wu Shui Bridge is located in the Heng Guang double-track railway DK1980 +150 meters away from the famous Dayaoshan Tunnel about 8 km of imports, across the Pearl River North River tributary - Wushui. The total length of the bridge is 273.80 meters, double ballasted bridge deck, of which the main span of 129.1 meters long prestressed concrete continuous beams. The span consists of 32 + 64 + 32 meters and the cross section is single box double chamber with three webs (see Figure 1). The height of the beam body is variable. The beam height at the mid-point is 5 m, and the beam height at the end-fulcrum and mid-span is 3
其他文献
随着国民经济的发展,在长江运输船舶迅速增长的同时,长江水上消防暴露出的问题已愈来愈突出,尤其是大型的特大型火灾时有发生,火灾引起的损失不断增大。例如1989年1月2日,×
据美国联邦航空管理署(FAA)称,为阻止恐怖主义爆炸,已研制出防爆空运集装箱,并已作好对这种新设计进行试验的准备。这一尝试受到了货运代理、航空公司和集装箱制造商的审慎
“七五”期间公路建设的重点是:经济干线、疏港公路、能源运输和国家确定的重点旅游线路。计划建设四十二条干线公路,建成二十七条,包括:北京塘沽高速公路142.5公里;北京沈
1.听说课。英语的听说课注重语言的大量输入,从而进行听的训练,在听的基础上,重视语言的输出,从而培养学生的听说能力。如何在语言的输入与输出过程中,体现出学生互教互学,具
建设中的日本北陆新干线被誉为日本21世纪高速交通体系骨干的北陆新干线,经由长野、富山、小浜等市,是东京—大阪间的又一条联结线,全长700km,它对日本国土的均衡发展有十分重要的意义。
重庆市许多行政村面积大、居住散,山水相隔、行路艰难,很多农民群众到书屋要步行两三个小时。为解决这一突出问题,重庆市为每个书屋增加1000元投入,创造性地实施了1个书屋设2
沅水流域全水系水能总蕴藏量794万kW,其中湖南省境内538万 kW。干流规划建设15个梯级电站,装机容量390万 kW,年发电量167亿 kW·h。其中湖南境内由五凌公司开发的10个梯级电
本文旨在探讨体脂与骨量的关系,以及调节体脂的瘦素对骨的作用。选用6月龄雌性Wistar大鼠40只,随机分为两组,一组切除双侧卵巢,另一组行假手术。饲养2月后采用ELISA检测血清
在公路工程中,路面基层的强度和稳定性对道路总体质量起重要作用。路面破坏主要是基层的强度不足和水稳性不良所致。无论是沥青路面或水泥混凝土路面,对基层都有严格要求,应具有
由中国海洋工程学会、中国土木工程学会港口工程专业委员会、中国水利学会港口航道专业委员会、天津水运工程学会联合主办的第四届全国海岸工程学术讨论会于一九八六年十月