论文部分内容阅读
山东省水库洪水调度工作已进行了方案的编制和审批、几期洪水实时调度的监督及汛后总结制度,初步走上了科学化、正规化、规范化管理的轨道.但存在着一些水库在设计中未考虑汛期防洪限制水位,大、中型水库的运行多数年份汛木蓄水达不到指标等问题.为此提出的对策有:(1)科学界定水库洪水调度“汛期”;(2)划分汛期时段,核定分期控制水位;(3)复核设计洪水校正水库特征水位.还应加强执行有关法规、抓紧除险加固以及改善技术装备、提高人员素质等工作.
Shandong reservoir flood dispatching work has been the preparation and approval of the program, several real-time flood monitoring and flood control summary system, embarked on a scientific, standardized and standardized management of the track. However, some reservoirs do not consider the design of flood control flood control level, large and medium-sized reservoirs running most of the year reach the indicators of flood storage of wood and other issues. The countermeasures proposed for this are as follows: (1) Scientifically defining the flood season of reservoirs as “flood season”; (2) Dividing the flood season into periods and verifying the phased control of the water level; (3) Reviewing the design flood to correct the characteristic water level of reservoirs. Should also strengthen the implementation of relevant laws and regulations, pay close attention to reinforcement and improvement of technical equipment, improve personnel quality and other work.