摘要:随着我国经济的飞速发展,能源问题被提到越来越重要的地位。建筑的供配电系统的节能降耗问题则更显得重要。我国大约有建筑面积五百多亿平方米,能源消耗比世界平均水平高出1-2倍,而电气建筑部分的能源消耗更是明显,因此,降低建筑电气节的能源消耗是大势所趋。但是电气建筑节能是一项技术性很强,影响因子复杂的工程。所以,电气工程师应对所负责的电气工程质量具有高度负责的责任心,充分应用自己的专业水平深入、细致的搞好电气工程的技术、质量、进度、签证、安全等管理工作,同时,建筑的电气安装要符合节能的需要。
关键词:建筑电气电气安装
Abstract: along with the rapid development of China's economy, energy problems mentioned more and more important role. Construction of the power supply system of saving energy and reducing consumption problem is more important. Our country about construction area of over five hundred square meters, the consumption of energy resources is higher than the world's average level 1-2 times, and electrical building energy consumption is part of the obvious, therefore, reduce the energy consumption of the building electric integrity is the trend of The Times. But electric energy conservation of the building is a very technical, influence factor and complex engineering project. So, electrical engineer shall be responsible for the quality of the electrical engineering with highly responsible for the sense of responsibility, making full use of their professional level further careful do well electrical engineering technology, quality, progress, visa and safety management work, at the same time, the construction of the electrical installation should accord with the need of energy saving.
Keywords: building electrical electrical installation
中图分类号: TU855 文献标识码:A文章编号:
引言
随着建筑工程的不断扩大与发展,建筑电气安装也逐渐向数字化、综合化方向发展。人们在追求舒适、安全的居住环境的同时,对建筑电气的安装也提出高质量、高效率的要求。经过几十年的发展,建筑电气系统的技术和产品也不断更新换代、日新月异,但是随之而引发的问题也是越来越多。
1 电气安装过程中存在的主要问题
1.1管内穿敷电线存在的问题
(1)管线护口未戴,穿线时损伤导线绝缘层;
(2)导线颜色不分,产生相线不进开关等质量事故;
(3)导线接头不按规范操作,接触电阻超过限额;
(4)管内穿线数量过多;
(5)暗配在混凝土的配线管,拆模时外露,保护层不足,管子不畅通;三根及三根以上导管在同一处交叉;
1.2防雷保护设施存在的问题
(1)避雷保护线高度不够,不能起保护作用;
(2)避雷线搭接长度不符合要求,搭接脱落、虚焊;
(3)电器设备不做接地,配电箱盘面接地位置不明显;
(4)接地体埋深或间隔不够,焊接面不够,防腐处理不好,接地干线扁钢不平直,接地端子漏垫弹簧垫,断接卡所用螺柱小于M8,变形缝无补偿装置,接地电阻大,不符合设计要求。
1.3电器设备安装存在的问题
(1)配电箱在墙内暗装时,墙背面出现裂缝;
(2)成排、成行灯具安装不整齐,高度不一致,吊线上下档距不一,出现梯形。
(3)配电箱坐标、标高不准确或凹入墙面,移位、变形,箱盖内杂物未清除,防腐不及时。
(4)设备房内的设备振动噪声太大,外壳有漏电现象。
2 相应的防治措施
2.1设计图纸表意不明问题和相应措施
在整个的建筑工程中,每一步都会根据设计师的图纸一步一步进行,图纸是施工、安装阶段的前提和依据,电气安装也毫无例外。电气工程系统设备先进、管线繁锁,图纸设计者在设计中难免会出现错误亦或是漏洞,这些错误在电气安装过程中都会被放大,更多的时候,设计者不够专业或是对现场的情况并不是很了解都会造成这种问题。再者就是图纸设计者在图纸的表述中的偏差,现场的安装工作人员不能通过其简略描述而正确安装,这也是其中的一个原因。对于电气安装人员,必须详细消化图纸,对工程中的系统要做到心中有数,这样才能在现场发现问题、纠正错误。
2.2 材料质量问题和相应措施
材料是建筑电气安装中必不可少的,也是影响安装质量最为重要的因素之一。高品质的安装材料既可以节省资源和能源,又可以保证舒适、安全。例如,导线电阻率大、熔点低、性能差、绝缘差、温度系数较大;电缆耐压、耐温偏低、绝缘和抗腐蚀性差;开关、插座导电值与铭牌值有出入;塑料产品硬度和强度低、耐温、耐压低、安全性能差;导电金属片弹性不够强,接触不好,易磨损等等,都属于常见的材料问题。但是,由于材料设备的采购受多方面的限制,比如工程造价、材料属性、施工难度等各个方面的影响,在选择的过程中需各方面权衡,达到质量和效益的最优。
2.3 电线管预埋和敷设出现问题和措施
工程中电线管道错综复杂,所涉及的管道数目也有成千上万根,在电线管敷设工序上,施工企业对线路安装质量不够重视,企业内部质量保证体系通常“重主体、轻安装”,忽视安装环节。施工现场未配备专职电气质检员,管理失控,并且施工人员缺少专业技术训练,甚至无证上岗,对规范、标准不熟悉,就盲目施工,以上这些问题很容易引发故障。这种故障一旦出现解决就很麻烦,通常都会牵一发而动全身。所以在电线管预埋和敷设过程中要持有严谨的工作态度,严格按照规范行事。不能出现电线死结、凹痕、多层重叠等现象;在电线管和配电装置相连接时应考虑管口和箱体的固定,管线不应露出太长,不能出现管口不平、管线长短层次不齐等现象;预埋电线管时不应因为方便而仅用钳夹打结弯管口,而是用正规的塞头处理管口薄壁管不应代替厚壁管,黑铁管不应代替镀锌管。电线管预埋和敷设中的问题大都为细节问题,但往往可以从这些细节上看到工程的质量,细节上的漏洞和疏忽很可能就會为以后的安全埋下隐患,所以应足够重视这个方面的问题。
2.3.1针对管内穿敷电线的防治措施
(1)穿线前认真检查管线护口,发现漏戴,全部补齐,以免拉伤导线、绝缘层破坏、发生线路短路等现象。绝缘电阻不符合要求的,必须立刻更换。
(2)严格区分相线、零线和接地线的导线颜色,零线选用淡蓝色导线,接地线选用黄绿双色线,支路相线三相分别为黄、绿、红三色,不能混用。在导线穿管时,同时做好回路记号。
(3)截面为10 平方毫米及以下的单股铜芯线可直接与设备、器具的端子连接;截面大于10 平方毫米以上铜芯线须压接铜端子方能与设备、器具端子连接。每一接线端子处最多接连2根导线,若超过,则应另加T接装置,以保证导线接触良好。导线扒皮要正确操作,避免割伤线芯,影响正常使用。
(4)管内穿设导线的总截面积不应超过管子截面积的40%。
(5)暗配在混凝土内的配线管,保护层一般不少于15mm,消防管线的保护层不少于30mm;施工中要保证各种管子畅通,向上的管口应使用管堵临时封堵;严禁三根及三根以上导管在同一处交叉,必要时可在导管处增设钢丝网等加强措施,导管直径大于20mm时宜采用金属导管。
2.3.2针对防雷保护设施的防治措施
(1)避雷带安装高度要认真检查,保护角不得大于45°。不符合要求的,必须返工。
(2)避雷线搭接长度若采用镀锌扁铁,其搭接长度要大于6倍的扁铁宽度;若采用钢筋,其搭线长度要大于12倍的钢筋直径。并防止虚焊、假焊等现象发生。
(3)电器设备外壳必须接地,并应与接地干线单独连接,不能采用串联接法,配电箱盘面接地安装位置要明显,必须单独设接地螺栓。
(4)按规定接地体埋深应不小于0.6m,间距不小于5m。焊接面不小于扁钢宽度的2倍。焊好后将药皮敲净,镀锌层破坏处应二次防腐。重新调直扁钢,补齐接地端子弹簧垫子,断接卡连接应用不小于M8的镀锌螺栓,在变形缝处,利用本身材料做煨弯补偿。减小接地电阻的方法:增加接地极根数;使用化学药品,如:盐;换土。
2.3.3针对电气设备安装的防治措施
(1)墙内暗装的配电箱厚度要小于墙体厚度2cm以上,并在箱体背面加装钢丝网板,再做水泥砂浆,防止发生裂缝。
(2)成排、成行灯具安装要预放方格线,安装完毕统一调整吊杆或吊线长短,使其吊装高度保持一致。
(3)施工前,技术管理人员应对箱盒坐标、标高,详细进行交底,箱定位后,用钢筋套圈焊接固定,以防位移,并在箱内用刚性物做十字支撑,以防变形。拆模后,应及时清除杂物,修整箱,做好防腐工作。
(4)设备房内的设备应该与底座牢固安装,防止设备振动引起过大的噪声,安装人员同时应检查是否为设备本身质量问题而引起的噪声;另外在设备安装完毕后应该将设备的金属外壳通过多股BV-1X25导线与接地装置预留的接地板连接,防止设备金属外壳带电对检修人员造成伤害。
3 结语
随着人们生活水平的提高,電气安装工程的要求也越来越高,它不仅要满足照明、家电用电、安全用电等需要,而且更要注重其美观、适用、方便的使用效果。因此要抓好电气安装工程的质量管理工作,使电气安装工程朝着一个具有适用性、可靠性、经济性、外观优美与使用方便的方向发展。
参考文献:
[1]李玉梅.建筑电气设计与安装要注意的几个问题[J].黑龙江科技信息.2004,7.
[2]于洪亮.建筑电气安装工程中常见问题的探讨[J].黑龙江科技信息,2009(25).
注:文章内所有公式及图表请用PDF形式查看。
关键词:建筑电气电气安装
Abstract: along with the rapid development of China's economy, energy problems mentioned more and more important role. Construction of the power supply system of saving energy and reducing consumption problem is more important. Our country about construction area of over five hundred square meters, the consumption of energy resources is higher than the world's average level 1-2 times, and electrical building energy consumption is part of the obvious, therefore, reduce the energy consumption of the building electric integrity is the trend of The Times. But electric energy conservation of the building is a very technical, influence factor and complex engineering project. So, electrical engineer shall be responsible for the quality of the electrical engineering with highly responsible for the sense of responsibility, making full use of their professional level further careful do well electrical engineering technology, quality, progress, visa and safety management work, at the same time, the construction of the electrical installation should accord with the need of energy saving.
Keywords: building electrical electrical installation
中图分类号: TU855 文献标识码:A文章编号:
引言
随着建筑工程的不断扩大与发展,建筑电气安装也逐渐向数字化、综合化方向发展。人们在追求舒适、安全的居住环境的同时,对建筑电气的安装也提出高质量、高效率的要求。经过几十年的发展,建筑电气系统的技术和产品也不断更新换代、日新月异,但是随之而引发的问题也是越来越多。
1 电气安装过程中存在的主要问题
1.1管内穿敷电线存在的问题
(1)管线护口未戴,穿线时损伤导线绝缘层;
(2)导线颜色不分,产生相线不进开关等质量事故;
(3)导线接头不按规范操作,接触电阻超过限额;
(4)管内穿线数量过多;
(5)暗配在混凝土的配线管,拆模时外露,保护层不足,管子不畅通;三根及三根以上导管在同一处交叉;
1.2防雷保护设施存在的问题
(1)避雷保护线高度不够,不能起保护作用;
(2)避雷线搭接长度不符合要求,搭接脱落、虚焊;
(3)电器设备不做接地,配电箱盘面接地位置不明显;
(4)接地体埋深或间隔不够,焊接面不够,防腐处理不好,接地干线扁钢不平直,接地端子漏垫弹簧垫,断接卡所用螺柱小于M8,变形缝无补偿装置,接地电阻大,不符合设计要求。
1.3电器设备安装存在的问题
(1)配电箱在墙内暗装时,墙背面出现裂缝;
(2)成排、成行灯具安装不整齐,高度不一致,吊线上下档距不一,出现梯形。
(3)配电箱坐标、标高不准确或凹入墙面,移位、变形,箱盖内杂物未清除,防腐不及时。
(4)设备房内的设备振动噪声太大,外壳有漏电现象。
2 相应的防治措施
2.1设计图纸表意不明问题和相应措施
在整个的建筑工程中,每一步都会根据设计师的图纸一步一步进行,图纸是施工、安装阶段的前提和依据,电气安装也毫无例外。电气工程系统设备先进、管线繁锁,图纸设计者在设计中难免会出现错误亦或是漏洞,这些错误在电气安装过程中都会被放大,更多的时候,设计者不够专业或是对现场的情况并不是很了解都会造成这种问题。再者就是图纸设计者在图纸的表述中的偏差,现场的安装工作人员不能通过其简略描述而正确安装,这也是其中的一个原因。对于电气安装人员,必须详细消化图纸,对工程中的系统要做到心中有数,这样才能在现场发现问题、纠正错误。
2.2 材料质量问题和相应措施
材料是建筑电气安装中必不可少的,也是影响安装质量最为重要的因素之一。高品质的安装材料既可以节省资源和能源,又可以保证舒适、安全。例如,导线电阻率大、熔点低、性能差、绝缘差、温度系数较大;电缆耐压、耐温偏低、绝缘和抗腐蚀性差;开关、插座导电值与铭牌值有出入;塑料产品硬度和强度低、耐温、耐压低、安全性能差;导电金属片弹性不够强,接触不好,易磨损等等,都属于常见的材料问题。但是,由于材料设备的采购受多方面的限制,比如工程造价、材料属性、施工难度等各个方面的影响,在选择的过程中需各方面权衡,达到质量和效益的最优。
2.3 电线管预埋和敷设出现问题和措施
工程中电线管道错综复杂,所涉及的管道数目也有成千上万根,在电线管敷设工序上,施工企业对线路安装质量不够重视,企业内部质量保证体系通常“重主体、轻安装”,忽视安装环节。施工现场未配备专职电气质检员,管理失控,并且施工人员缺少专业技术训练,甚至无证上岗,对规范、标准不熟悉,就盲目施工,以上这些问题很容易引发故障。这种故障一旦出现解决就很麻烦,通常都会牵一发而动全身。所以在电线管预埋和敷设过程中要持有严谨的工作态度,严格按照规范行事。不能出现电线死结、凹痕、多层重叠等现象;在电线管和配电装置相连接时应考虑管口和箱体的固定,管线不应露出太长,不能出现管口不平、管线长短层次不齐等现象;预埋电线管时不应因为方便而仅用钳夹打结弯管口,而是用正规的塞头处理管口薄壁管不应代替厚壁管,黑铁管不应代替镀锌管。电线管预埋和敷设中的问题大都为细节问题,但往往可以从这些细节上看到工程的质量,细节上的漏洞和疏忽很可能就會为以后的安全埋下隐患,所以应足够重视这个方面的问题。
2.3.1针对管内穿敷电线的防治措施
(1)穿线前认真检查管线护口,发现漏戴,全部补齐,以免拉伤导线、绝缘层破坏、发生线路短路等现象。绝缘电阻不符合要求的,必须立刻更换。
(2)严格区分相线、零线和接地线的导线颜色,零线选用淡蓝色导线,接地线选用黄绿双色线,支路相线三相分别为黄、绿、红三色,不能混用。在导线穿管时,同时做好回路记号。
(3)截面为10 平方毫米及以下的单股铜芯线可直接与设备、器具的端子连接;截面大于10 平方毫米以上铜芯线须压接铜端子方能与设备、器具端子连接。每一接线端子处最多接连2根导线,若超过,则应另加T接装置,以保证导线接触良好。导线扒皮要正确操作,避免割伤线芯,影响正常使用。
(4)管内穿设导线的总截面积不应超过管子截面积的40%。
(5)暗配在混凝土内的配线管,保护层一般不少于15mm,消防管线的保护层不少于30mm;施工中要保证各种管子畅通,向上的管口应使用管堵临时封堵;严禁三根及三根以上导管在同一处交叉,必要时可在导管处增设钢丝网等加强措施,导管直径大于20mm时宜采用金属导管。
2.3.2针对防雷保护设施的防治措施
(1)避雷带安装高度要认真检查,保护角不得大于45°。不符合要求的,必须返工。
(2)避雷线搭接长度若采用镀锌扁铁,其搭接长度要大于6倍的扁铁宽度;若采用钢筋,其搭线长度要大于12倍的钢筋直径。并防止虚焊、假焊等现象发生。
(3)电器设备外壳必须接地,并应与接地干线单独连接,不能采用串联接法,配电箱盘面接地安装位置要明显,必须单独设接地螺栓。
(4)按规定接地体埋深应不小于0.6m,间距不小于5m。焊接面不小于扁钢宽度的2倍。焊好后将药皮敲净,镀锌层破坏处应二次防腐。重新调直扁钢,补齐接地端子弹簧垫子,断接卡连接应用不小于M8的镀锌螺栓,在变形缝处,利用本身材料做煨弯补偿。减小接地电阻的方法:增加接地极根数;使用化学药品,如:盐;换土。
2.3.3针对电气设备安装的防治措施
(1)墙内暗装的配电箱厚度要小于墙体厚度2cm以上,并在箱体背面加装钢丝网板,再做水泥砂浆,防止发生裂缝。
(2)成排、成行灯具安装要预放方格线,安装完毕统一调整吊杆或吊线长短,使其吊装高度保持一致。
(3)施工前,技术管理人员应对箱盒坐标、标高,详细进行交底,箱定位后,用钢筋套圈焊接固定,以防位移,并在箱内用刚性物做十字支撑,以防变形。拆模后,应及时清除杂物,修整箱,做好防腐工作。
(4)设备房内的设备应该与底座牢固安装,防止设备振动引起过大的噪声,安装人员同时应检查是否为设备本身质量问题而引起的噪声;另外在设备安装完毕后应该将设备的金属外壳通过多股BV-1X25导线与接地装置预留的接地板连接,防止设备金属外壳带电对检修人员造成伤害。
3 结语
随着人们生活水平的提高,電气安装工程的要求也越来越高,它不仅要满足照明、家电用电、安全用电等需要,而且更要注重其美观、适用、方便的使用效果。因此要抓好电气安装工程的质量管理工作,使电气安装工程朝着一个具有适用性、可靠性、经济性、外观优美与使用方便的方向发展。