论文部分内容阅读
一、冶炼项目(一)原料工程由18台堆取料机、337条皮带输送机和30台破碎筛分设备组成,年供料量为3106×104吨。1矿石粉碎短头圆锥破碎机。采用短头圆锥破碎机与棒磨机粉碎工艺相比可节省投资30%,经营费用节省25%。2混匀定量配料装置。提高了混匀?
1. Smelting Project (1) The raw material project consists of 18 stacker reclaimers, 337 belt conveyors, and 30 crushing and screening equipment. The annual supply volume is 3106×104 tons. 1 ore crushed short head cone crusher. The short head cone crusher can save 30% investment compared with the rod mill crushing process and save 25% in operating expenses. 2. Mix the quantitative dosing device. Increased mixing?