随着我国水运事业的迅速发展,镇江大港将要建造一批两万吨级的泊位。桩基设计与施工是平台建造中较为困难的关键问题之一。为合理解决这一问题,正确选择桩尖结构形式、确定桩基承载能力,并深入开展桩基工程的科研工作,交通部第二航务工程局今年上半年委托我院及南京水利科学研究所、华东水利学院等在大港进行试桩。这次试桩工作的内容较为广泛。除土压力和水平载荷分别由南京水科所与华东水院承担
With the rapid development of China’s water transport industry, a batch of 20,000-ton berths will be built in Zhenjiang Dagang. Pile foundation design and construction is one of the most difficult problems in platform construction. In order to solve this problem reasonably, correctly select the form of pile tip, determine the bearing capacity of pile foundation and carry out the research work of pile foundation engineering in depth, the Second Navigation Engineering Bureau of the Ministry of Communications entrusted the Institute and Nanjing Water Conservancy Science Research Institute in the first half of this year, Huadong Hydraulic Institute and other test pilots in Dagang. The contents of the test pile work is more extensive. In addition to earth pressure and horizontal load by the Nanjing Water Institute and East China Water Institute commitment