认真总结葛洲坝工程经验为三峡工程的兴建做好准备

来源 :水力发电 | 被引量 : 0次 | 上传用户:kongjiahao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
葛洲坝工程自1981年胜利实现了大江截流、二江发电、三江通航后,到1983年底,一期工程已全部建成,经过验收,正式投入运用。这是一件值得庆贺的大事。葛洲坝工程是我国在长江干流上修建的第一座大型水利枢纽工程,其工程规模和技术复杂程度都超过了我国水利水电建设曾经达到的水平。开工以来,在党中央,国务院的领导和关怀下, Since the Gezhouba Project had achieved great river closure, the production of the Erjiang power, and the navigation of the Sanjiang River in 1981, by the end of 1983, the first phase of the project had been completed, and it was formally put into operation after acceptance. This is a great event to celebrate. The Gezhouba Project is the first large-scale water control project built on the mainstream of the Yangtze River in China. Its engineering scale and technical complexity exceed the level reached by China’s water conservancy and hydropower construction. Since the start of the work, under the leadership and care of the Central Party Committee and the State Council,
其他文献
本世纪对常规能源的分析表明,天然气在能源生产构成中的比重将不断增加(见表)。因此迫需寻找新的天然气资源,以适应它发展的需要。目前世界各国勘探与开发的天然气,主要是油
我国拖拉机行业已普遍采用模锻,生产能力富裕,尚可为其它行业甚至出口提供锻件。提高模锻零件的材料利用率,对本行业有着重要的经济意义。据资料,每生产一吨钢材约耗用450~72
【日本《原子能工业》1984年第3期第64页报道】日本原子能研究所于1963年引进 BWR 型轻水动力试验堆(敦贺1号),成功地进行了第一次发电,但该动力试验堆压力容器使用的却是日
【英国《国际核工程》1983年7月号第32页报道】当美国核管理委员会在失水试验装置上进行的实验接近尾声时,经济合作与发展组织的核能机构组成一个国际财团支援美国能源部,以
(六) 对发展中两个情况的分析在我国第二次调整期间,电力弹性系数小于“一”。于是,有人提出了我国是否已经进入了低弹性系数发展的新阶段的问题。日本,近年来电力弹性系数
压缩流动资金、加快资金周转速度是当前我国企业在改善经营管理中一项值得重视的工作。这方面我国与国外差距很大,大有潜力可挖。如日本的丰田汽车公司,由于改变了很多传统
我国建筑卫生陶瓷工业已有几十年的生产历史,建国后经过三十年的发展,生产技术水平不断提高,无论在产品产量和质量等方面都有很大增长,有的工厂担任着出口任务。目前有六十
“欧洲及北美工业静电除尘器市场情况”调查报告分析指出,合成燃料工业是静电除尘器需求量增长的主要部门之一,该报告是美国MCIL vaine公司发表的。在八十年代里,美国合成燃
一、解决农村能源问题已成燃眉之急目前,我国广大农村能源短缺,浪费严重。按全国平均,人均为0.6吨标准煤/年,在农村,人均为0.14吨标准煤/年,大约有45%的农户严重缺柴,42%的
安徽省霍丘铁矿位于两淮煤田西南缘,自1957年发现以来,经多年的地质普查、勘探工作,已查明铁矿是由十余个铁矿床组成的大型铁矿区.但是,以往认为矿石品位低、硅酸铁高、有一