论文部分内容阅读
为提高植树造林质量,改过去一边刨坑一边栽树的做法为夏刨坑春栽树,可省工、省力,提高成活率,其方法如下:在准备明春栽树的山坡上、山沟里,趁着夏季雨后地塇,挖出直径和深度各约0.7米的坑,并把挖出的石块和土围于坑的下沿,使其形成鱼鳞坑,再把其上沿两米以内的杂草带土刨入坑内,并边刨边捡除石头,直到填满为止。等到明春栽树时,再根
In order to improve the quality of tree planting and afforestation, we should change the plan of planting trees in the past while planting trees in spring in order to save labor, save labor and improve the survival rate. The method is as follows: On the hillside planted with trees in spring, , Take advantage of summer rains to dig out about 0.7 meters in diameter and depth of the pit, and the excavated stones and soil in the pit along the edge of the formation of fish-scale pit, and then along the two meters Within the weeds with soil planing into the pit, and while planing pick up stones, until the fill up. Wait until tomorrow to plant trees, then root