论文部分内容阅读
桥台、桥墩、沉井灌注是建大桥的最主要最关键的工序。灌注需要立模。按照常规,立模灌注一节后要等二十四小时混凝土终凝后才能再打下一节。××铁路复线是“五保卫”线。是埋葬帝、修、反的战备线。时间不能拖延,只能提前再提前。×局五处八队广大革命职工决心破除常规,采取连续灌洼。这时有人一本正经地说:“分节灌注这是科学。连续灌注书上没有动不得。”广大革命职工理直气壮地说:“实践出科学,劳动人民本来就是科学技术的主人,没有劳动人民的实践也就无所谓科学。书是人写的,桥是人建的,干革命就要闯,书上没有我们用毛泽东思想来写。”他们遵照毛主席关于“研究任何过程,如果是存在着两个以上矛盾的复杂过程的话就要用全力找出它的主要矛盾。捉住了这个主要矛盾,一切问题就迎刃而解了”的伟大教导,反复分析了灌注过程中的矛盾,时间衔接是主要问题。如桥墩灌注完第一节后再
Bridge abutments, piers, sunk well perfusion is the most important construction of the most critical bridge process. Perfusion need to stand mold. As a general rule, pour a section after the mold to be twenty-four hours after the final setting of concrete before you can lay the next section. × × Railway double line is “five security” line. Buried Emperor, repair, anti-war readiness line. Time can not be delayed, can only advance in advance. × Bureau of five eight team majority of revolutionary workers determined to get rid of routine, to take continuous irrigation depression. At this time, someone said solemnly, “This is a science of sub-perfusion, and there is no chance of continuous infusion of books.” The revolutionary workers confidently said: “In practice, working people are already masters of science and technology and have no practical experience of working people It does not matter that science books are written, the bridge is built, the revolution will break, the book we did not use Mao Zedong Thought to write. ”They follow Chairman Mao on“ any process of studying, if there are two The above complex process of contradictions must be done with full efforts to find out its main contradiction, to seize this major contradiction, and to solve all problems, ”the great teaching, repeated analysis of the contradictions in the perfusion process, time convergence is the main problem. If the pier perfusion after the first quarter