太原第二热电厂近几年来调峰任务不断加重,锅炉启停频繁,造成炉墙漏风严重,燃烧不稳,灭火故障时有发生.特别是由于旋转调峰幅度增加,当锅炉负荷低于80%额定负荷时,燃烧进一步恶化,必须投油助燃,限制了旋转调峰幅度,增加助燃用油量,并使灭火的机率增加,影响安全运行.为适应调峰需要,低负荷稳燃,节省助燃用油,该厂与清华大学热能工程系合作,在锅炉下排燃烧器位置加装多功能燃烧器,取得了较好的经济效益.
In recent years, Taiyuan No.2 Thermal Power Plant has been continuously increasing peak load, causing frequent start-up and stoppage of the boiler, leading to serious air leakage in the furnace wall, unstable combustion and fire-extinguishing failure, especially due to the increase of rotational peak- Rated load, the combustion deteriorated further, must be oil combustion and combustion, limiting the rotation amplitude, increase combustion oil, and increase the probability of extinguishing fire, affecting safe operation. In order to meet the needs of peak regulation, low load stable combustion, saving combustion Oil, the plant and the Department of Thermal Engineering, Tsinghua University, the lower burner in the boiler position to install multi-burner, and achieved good economic returns.