论文部分内容阅读
2015年12月15日,锡盟—泰州±800千伏特高压直流输电工程正式开工建设。作为大气污染防治行动计划“四交四直”特高压工程之一,锡泰工程对于构建华东地区强交强直特高压电网、提高外电入苏比例、改善区域大气质量、提升江苏发展水平和生态文明建设水平,具有重要战略意义。锡泰工程开工,将为江苏未来经济社会的发展注入更多的活力。用能大省期待绿色低碳发展江苏电网的电源构成主要为火电系统。截至2015年11月底,江苏省
December 15, 2015, Ximeng - Taizhou ± 800 kV UHVDC project was officially started construction. As one of the “Action Plan for Prevention and Control of Air Pollution”, one of the special projects of “Four Crossing Four Straits”, Xitai Project is of great significance to the construction of a strong UHV power grid in East China, enhancing the ratio of foreign electricity to the Soviet Union, improving the regional air quality, The level of ecological civilization construction, has important strategic significance. Sitai project started, Jiangsu will be the future economic and social development into more vitality. With the province can look forward to the development of low-carbon green power grid in Jiangsu Province constitute the main thermal power system. As of the end of November 2015, Jiangsu Province