摘要:前干挂石材已占有相当大的比例,并具逐年上升趋势。但是,笔者认为从事石材装饰干挂(粘)施工,要达到装饰施工的设计和验收质量,不断增加建筑美学知识,领会建筑师本意,听取各方面意见等。最后才能设计和施工出安全、协调、美观的石材幕墙。
关键词:干挂石材,施工,技术
Abstract: dry hanging stone material before already owned a significant proportion of, and has increased year after year trend. But, the author thinks that engaged in dry hanging stone decoration (stick) construction, and to achieve the design and decoration construction acceptance quality, increase building aesthetic knowledge, understand the architect original meaning, listen to opinions from various aspects. Finally it can design and construction was a safety, coordination, beautiful stone curtain wall.
Keywords: dry hanging stone material, construction, technology
中图分类号:TU521.2文献标识码:A 文章编号:
随着建筑业和装修行业的快速发展,国内石材干挂、室内干粘工法在国际上属于生产和使用大国,为了追求建筑物的完美、安全、健康、节能、环保、自然和谐等,越来越多的装饰材料选用天然装饰石板、微晶石、合成石及各种复合装饰板作为建筑物内外饰面材料。近年来,石材干挂工程在我国呈现逐年上升趋势。
1、石材干挂法的概述
石材干挂法又名空挂法。是当代饰面饰材装修中一种新型的施工工艺。该方法以金属挂件将饰面石材直接吊挂于墙面或空挂于钢架之上,不需再灌浆粘贴。其原理是在主体结构上设主要受力点,通过金属挂件将石材固定在建筑物上,形成石材装饰幕墙。板材的固定方法有:(1)插销式固定法;(2)后切式干挂,也称无应力锚固式干挂。
主要安装工艺:外墙面防水砂浆粉刷打底→涂布弹性防水涂料→测量放线→龙骨安装→避雷连接→层间防火安装→石材安装→石材面层打胶→清洁→整体验收。
2、石材干挂幕墙施工技术
目前有很多装饰装修工程上采用了干挂石材幕墙的施工方案,它不仅增加了建筑物在外形立面上的视觉美感,也增加了建筑物的庄重感。但是,在实际中因选材不合理、施工方法不当等因素而引起的石材干挂幕墙安全性和美观性问题,应当引起业界的高度重视。
2、1加强对花岩石材料的质量控制
由于石材的表面缺陷,几何尺寸及色彩、花纹将直接影响建筑的装饰效果,因此石材进场后,在核对规格、数量的同时,还应对其外观进行严格的挑选。主要进行三方面的工作:检查表面是否有样品相符,凡板面有裂纹、板边缺棱掉角、槽边有破损的一律不得使用,并对保管提出严格要求,绝对不能雨淋,保证不与包装材料串色。
石材对幕墙的外观质量具有决定性的影响,选择的总体要求是能保证色泽均匀一致、质量可靠稳定、加工技术、设备先进、供应及时和价格相对合理。具体在选择时,要根据幕墙设计方案和施工图纸所要求的色调、强度、规格、尺寸等要求进行,用于外墙石材的品种应采用色泽、纹理变化较小、质地均匀致密并具有良好的抗老化、耐磨、耐候性和抗弯曲强度高的花岗岩石材,以保证其设计使用年限要求。具体操作时,要了解石材的产地分布和质量情况,从中筛选出色泽与设计外观要求相符、质量相对稳定、价格合理、矿藏批量又能满足工程用量要求的具体石材品种,确定运输方便、快捷、及时的产地,选择开采、加工设备配套齐全、技术相对先进、加工能力和质量有保证、产量满足工程使用进度需要、信誉良好、有较强的经营实力的合格供应商。
2、2基层检查与处理
在墙体结构验收合格的基础上,再对墙面进行检测,将墙面基层表面清理干净,对局部影响骨架安装的凸出部分剔凿干净。特别是墙面的垂直度、平整度偏差应控制在连接件的可调整范围,一般在土10mm内,否则会影响整个干挂墙面的水平位置,应及时调整使其符合设计规范要求。
2、3主次龙骨安装及防腐处理
在粉刷好的水泥砂浆基层上,弹出水平控制线和垂直控制线,并根据花岗石的放样弹出每块花岗石的分格线,以便钻孔,并根据设计安放好做主次龙骨的槽钢,主友骨间距不大于1600㎜,若结构缺少预埋件,则采用12膨胀螺栓紧固,并配有穿墙扁钢与主龙骨焊接,检查槽钢是否垂直、水平、平整度是否符合要求,待检查合格后方可紧固螺栓、槽钢间点焊。槽钢焊接必须是经过培训的有证焊工,大面积施工时,考虑到施焊时对槽钢产生的温度变形因素,宜多名焊工在其对称部位同时烧焊以减小变形。并对焊缝高度、宽度及变形情况及时检查,不符合要求的及时补焊或校正。施焊完毕后,及时清理焊渣,符合质量x-x常委会后,涂刷防腐漆两道。
2、4花岗石安装与防水处理
挂花岗石板材前,托板、舌板应采用不锈钢螺栓初步连接,舌板的进出、高低由通长的细钢丝拉线控制,允许2㎜,安装由下而上逐皮进行,板间横竖缝间隙为5㎜,先试挂一小块面积,验收合格后,以此为样板,方可进行大面积干挂。板材安装完毕,应对墙进行一次全面的检查,检查板材十字缝的拼接、表面平整、色彩是否一致等,检查合格并清除所有板材面层余浆残迹,然后用密封胶嵌缝,边嵌边擦干净,使缝隙密实,颜色、缝隙大小一致。
3、关键工序的质量要求与技术措施
3、1连接件焊接
一般采用“预埋件+连接板+不锈钢挂件”或“预埋件+连接板+型钢龙骨+不锈钢挂件”固定石材的安装工艺;预埋件已于结构施工时完成。保证预埋件与连接板及龙骨的焊接质量对外饰面的牢固与耐久尤为重要。特作如下要求: 焊接前清理焊口,焊缝周围不得有油污、锈物。焊接施工时应在业主现场代表及监理方的见证下取同样厚度预埋板、连接件、型钢、焊条、焊接电流做同条件焊接试件,并送有关合法检测部门检测。 正式施焊时应正确掌握焊接速度,要求等速焊接,保证焊缝厚度宽度均匀一致。对电弧长、焊接角度(偏于角钢一侧)、引弧与收弧都应设计文件与焊接规程执行。清除熔渣后进行外观及焊缝尺寸自检,确认无问题后方可转移地点继续焊接。
3、2石材安装
应根据翻样图核对板材规格,核对无误后进行板端开槽和板材安装。为保证开槽的质量(垂直度、槽深、槽位),可采取如下措施:现场制作木制石材固定架,将石板固定后再开槽。槽位上下对齐T型挂件,标出位置后再开槽。槽深用云石机及标尺杆预先调好位置,以标尺杆顶住石材,槽深度16mm为宜。开槽完毕应进行自检,包括槽深、位置、垂直度、槽侧石材有无劈裂。 石材上墙前,先清除槽内浮尘、石渣;试挂(板位、板垂直等要求见下表)后,槽内注胶、安装石,靠尺校核。外饰面允许偏差应符合“JGJ73-91”规范要求。
3、3嵌缝
用特制板刷清理石材板缝,将缝内滞存物、污染物、粉末清除干净,再施刷丙酮水两遍,以增加密封胶的附着能力。宽缝填塞泡沫嵌缝条。嵌缝条为20,填塞深度应平直一致(距石材板面8mm)、无重叠,遇挂件断开时碰头缝严密无空隙。嵌缝胶为美产DC硅酮密封胶,打胶先贴胶条,避免污染相邻石材,石材嵌胶后胶体呈弧形内凹截面,内凹面距石材表面l.5mm。胶枪嵌缝分段一次完成,速度应保证嵌缝无气泡、不断胶。嵌缝胶馏压应在初凝成型时完成,保证外形一致。
4、结束语
总之,石材干挂工艺优点:(1)有效地避免传统湿贴工艺出现的板材空鼓、开裂、脱落等现象,明显提高了建筑物的安全性和耐久性;(2)完全避免传统湿贴工艺板面出现的泛白、变色等现象,有利于保持幕墙清洁美观;(3)一定程度上改善施工人员的劳动条件,减轻了劳动强度,也有助于加快工程进度。
但是,从事石材装饰干挂(粘)施工,要达到装饰施工的设计和验收质量,必须围绕“人、机、料、法、环”五大施工质量控制要素展开工作,任何一个环节控制不到位,都会影响到整个施工质量达不到相应的要求。只有认真严格控制影响施工质量的几个要素,抓好每个环节过程的施工质量,才能生产出符合质量要求的装饰效果。
参考文献
1、杨勇。干挂石材幕墙在建筑外墙装饰中的应用及应注意的问题[J],工程与建设,2010
2、葛云发。干挂石材幕墙施工技术要求[J]。江西建材,2010年第1期
3、杜典波。外墙石材干挂施工技术与质量控制要点[J],广西城镇建设,2005年第2期
注:文章內所有公式及图表请用PDF形式查看。
关键词:干挂石材,施工,技术
Abstract: dry hanging stone material before already owned a significant proportion of, and has increased year after year trend. But, the author thinks that engaged in dry hanging stone decoration (stick) construction, and to achieve the design and decoration construction acceptance quality, increase building aesthetic knowledge, understand the architect original meaning, listen to opinions from various aspects. Finally it can design and construction was a safety, coordination, beautiful stone curtain wall.
Keywords: dry hanging stone material, construction, technology
中图分类号:TU521.2文献标识码:A 文章编号:
随着建筑业和装修行业的快速发展,国内石材干挂、室内干粘工法在国际上属于生产和使用大国,为了追求建筑物的完美、安全、健康、节能、环保、自然和谐等,越来越多的装饰材料选用天然装饰石板、微晶石、合成石及各种复合装饰板作为建筑物内外饰面材料。近年来,石材干挂工程在我国呈现逐年上升趋势。
1、石材干挂法的概述
石材干挂法又名空挂法。是当代饰面饰材装修中一种新型的施工工艺。该方法以金属挂件将饰面石材直接吊挂于墙面或空挂于钢架之上,不需再灌浆粘贴。其原理是在主体结构上设主要受力点,通过金属挂件将石材固定在建筑物上,形成石材装饰幕墙。板材的固定方法有:(1)插销式固定法;(2)后切式干挂,也称无应力锚固式干挂。
主要安装工艺:外墙面防水砂浆粉刷打底→涂布弹性防水涂料→测量放线→龙骨安装→避雷连接→层间防火安装→石材安装→石材面层打胶→清洁→整体验收。
2、石材干挂幕墙施工技术
目前有很多装饰装修工程上采用了干挂石材幕墙的施工方案,它不仅增加了建筑物在外形立面上的视觉美感,也增加了建筑物的庄重感。但是,在实际中因选材不合理、施工方法不当等因素而引起的石材干挂幕墙安全性和美观性问题,应当引起业界的高度重视。
2、1加强对花岩石材料的质量控制
由于石材的表面缺陷,几何尺寸及色彩、花纹将直接影响建筑的装饰效果,因此石材进场后,在核对规格、数量的同时,还应对其外观进行严格的挑选。主要进行三方面的工作:检查表面是否有样品相符,凡板面有裂纹、板边缺棱掉角、槽边有破损的一律不得使用,并对保管提出严格要求,绝对不能雨淋,保证不与包装材料串色。
石材对幕墙的外观质量具有决定性的影响,选择的总体要求是能保证色泽均匀一致、质量可靠稳定、加工技术、设备先进、供应及时和价格相对合理。具体在选择时,要根据幕墙设计方案和施工图纸所要求的色调、强度、规格、尺寸等要求进行,用于外墙石材的品种应采用色泽、纹理变化较小、质地均匀致密并具有良好的抗老化、耐磨、耐候性和抗弯曲强度高的花岗岩石材,以保证其设计使用年限要求。具体操作时,要了解石材的产地分布和质量情况,从中筛选出色泽与设计外观要求相符、质量相对稳定、价格合理、矿藏批量又能满足工程用量要求的具体石材品种,确定运输方便、快捷、及时的产地,选择开采、加工设备配套齐全、技术相对先进、加工能力和质量有保证、产量满足工程使用进度需要、信誉良好、有较强的经营实力的合格供应商。
2、2基层检查与处理
在墙体结构验收合格的基础上,再对墙面进行检测,将墙面基层表面清理干净,对局部影响骨架安装的凸出部分剔凿干净。特别是墙面的垂直度、平整度偏差应控制在连接件的可调整范围,一般在土10mm内,否则会影响整个干挂墙面的水平位置,应及时调整使其符合设计规范要求。
2、3主次龙骨安装及防腐处理
在粉刷好的水泥砂浆基层上,弹出水平控制线和垂直控制线,并根据花岗石的放样弹出每块花岗石的分格线,以便钻孔,并根据设计安放好做主次龙骨的槽钢,主友骨间距不大于1600㎜,若结构缺少预埋件,则采用12膨胀螺栓紧固,并配有穿墙扁钢与主龙骨焊接,检查槽钢是否垂直、水平、平整度是否符合要求,待检查合格后方可紧固螺栓、槽钢间点焊。槽钢焊接必须是经过培训的有证焊工,大面积施工时,考虑到施焊时对槽钢产生的温度变形因素,宜多名焊工在其对称部位同时烧焊以减小变形。并对焊缝高度、宽度及变形情况及时检查,不符合要求的及时补焊或校正。施焊完毕后,及时清理焊渣,符合质量x-x常委会后,涂刷防腐漆两道。
2、4花岗石安装与防水处理
挂花岗石板材前,托板、舌板应采用不锈钢螺栓初步连接,舌板的进出、高低由通长的细钢丝拉线控制,允许2㎜,安装由下而上逐皮进行,板间横竖缝间隙为5㎜,先试挂一小块面积,验收合格后,以此为样板,方可进行大面积干挂。板材安装完毕,应对墙进行一次全面的检查,检查板材十字缝的拼接、表面平整、色彩是否一致等,检查合格并清除所有板材面层余浆残迹,然后用密封胶嵌缝,边嵌边擦干净,使缝隙密实,颜色、缝隙大小一致。
3、关键工序的质量要求与技术措施
3、1连接件焊接
一般采用“预埋件+连接板+不锈钢挂件”或“预埋件+连接板+型钢龙骨+不锈钢挂件”固定石材的安装工艺;预埋件已于结构施工时完成。保证预埋件与连接板及龙骨的焊接质量对外饰面的牢固与耐久尤为重要。特作如下要求: 焊接前清理焊口,焊缝周围不得有油污、锈物。焊接施工时应在业主现场代表及监理方的见证下取同样厚度预埋板、连接件、型钢、焊条、焊接电流做同条件焊接试件,并送有关合法检测部门检测。 正式施焊时应正确掌握焊接速度,要求等速焊接,保证焊缝厚度宽度均匀一致。对电弧长、焊接角度(偏于角钢一侧)、引弧与收弧都应设计文件与焊接规程执行。清除熔渣后进行外观及焊缝尺寸自检,确认无问题后方可转移地点继续焊接。
3、2石材安装
应根据翻样图核对板材规格,核对无误后进行板端开槽和板材安装。为保证开槽的质量(垂直度、槽深、槽位),可采取如下措施:现场制作木制石材固定架,将石板固定后再开槽。槽位上下对齐T型挂件,标出位置后再开槽。槽深用云石机及标尺杆预先调好位置,以标尺杆顶住石材,槽深度16mm为宜。开槽完毕应进行自检,包括槽深、位置、垂直度、槽侧石材有无劈裂。 石材上墙前,先清除槽内浮尘、石渣;试挂(板位、板垂直等要求见下表)后,槽内注胶、安装石,靠尺校核。外饰面允许偏差应符合“JGJ73-91”规范要求。
3、3嵌缝
用特制板刷清理石材板缝,将缝内滞存物、污染物、粉末清除干净,再施刷丙酮水两遍,以增加密封胶的附着能力。宽缝填塞泡沫嵌缝条。嵌缝条为20,填塞深度应平直一致(距石材板面8mm)、无重叠,遇挂件断开时碰头缝严密无空隙。嵌缝胶为美产DC硅酮密封胶,打胶先贴胶条,避免污染相邻石材,石材嵌胶后胶体呈弧形内凹截面,内凹面距石材表面l.5mm。胶枪嵌缝分段一次完成,速度应保证嵌缝无气泡、不断胶。嵌缝胶馏压应在初凝成型时完成,保证外形一致。
4、结束语
总之,石材干挂工艺优点:(1)有效地避免传统湿贴工艺出现的板材空鼓、开裂、脱落等现象,明显提高了建筑物的安全性和耐久性;(2)完全避免传统湿贴工艺板面出现的泛白、变色等现象,有利于保持幕墙清洁美观;(3)一定程度上改善施工人员的劳动条件,减轻了劳动强度,也有助于加快工程进度。
但是,从事石材装饰干挂(粘)施工,要达到装饰施工的设计和验收质量,必须围绕“人、机、料、法、环”五大施工质量控制要素展开工作,任何一个环节控制不到位,都会影响到整个施工质量达不到相应的要求。只有认真严格控制影响施工质量的几个要素,抓好每个环节过程的施工质量,才能生产出符合质量要求的装饰效果。