TBM挤压大变形隧洞管片错台及加固机理研究

来源 :山东大学学报(工学版) | 被引量 : 0次 | 上传用户:FLEXCN
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
软岩是重大交通、水电、矿山等工程建设中经常遇到的复杂介质,高地应力作用下软岩地下工程很容易产生围岩大变形,不仅对施工安全造成影响,而且还会造成建设工期和成本的迅速增加。软岩大变形已成为我国交通、水利、深部资源开发等工程领域亟待解决的重大课题。本研究以引大济湟隧道掘进机(tunnel boring machine,TBM)挤压大变形导致的管片错台为例,通过对现场监测成果的反演分析,系统研究挤压大变形不同错台的修复与控制方法,本研究成果对其他膨胀泥岩卡机事故脱困以及管片错台的工程具有指导意义。 Soft rock is a complex medium often encountered in major traffic, hydropower, mining and other engineering construction. Under high ground stress, the soft rock underground project is prone to large deformation of surrounding rock, which not only affects the construction safety, but also causes the construction period and The rapid increase in cost. Large deformation of soft rock has become China's transportation, water conservancy, deep resource development and other engineering fields to be solved major issues. In this paper, taking the tunnel boring machine (TBM) as an example, the dislocation of the pipe slice caused by the large deformation is taken as an example. By analyzing the field monitoring results, Repair and control methods. The results of this research are instructive for the project of other expansion mud-rocker accident-free machines and the project of the fault-piece management.
其他文献
设计并完成前后排抗滑桩加固滑坡桥基的振动台模型试验。通过输入不同频率、加速度峰值的正弦波,分析振动时桥墩基桩、抗滑桩的受力变形规律,以及PGA放大系数变化特性。试验
我国新一轮课程改革明确要求各地教育工作者充分利用乡土教材对学生进行理想信念教育、爱国主义教育和热爱家乡、立志建设家乡教育.76年前红西路军浴血河西、兵败祁连的壮举
目前,不同于‘一刀切’式的传统教育的大学英语分层教学,由于其面向全体学生等其他特点,每一个学生都能在这种教学模式中受益,也因此受到越来越多的人关注。本文在详细分析了
框架式幕墙系统中横梁与立柱之间的连接常见的有两种形式,其中一种为通过螺栓角码连接的开口横梁连接形式,另一种为通过套芯销钉连接的闭口横梁连接形式,这两种连接形式的连
将持久荷载引起的钢管应力增量作为初始应力,提出徐变应力度的概念,根据极限平衡理论推导了钢管混凝土(CFT)短柱在持续轴压荷载作用之后的截面强度计算公式,并将该计算结果与