论文部分内容阅读
介绍了冷连轧机组机械设备未全部安装、电气设备无法进行正常外部联合调试时辊缝位置和轧制力实际值模拟的实现方法和轧制力实际值的计算公式,并且使用模拟出的辊缝位置及轧制力实际值进行相应控制器的测试及辊缝自动标定。
This paper introduces the realization method of the actual value of the roll gap position and rolling force when the mechanical equipments of the cold tandem rolling mill are not all installed and the electrical equipment can not carry out the normal external joint debugging and the formula for calculating the actual value of the rolling force. Seam position and the actual value of the rolling force of the corresponding controller test and automatic calibration of the roll gap.