介绍了巴昆水电工程概况及拟建的直流高压输电技术。预计最迟到2003年8月,巴昆电站将完全投入商业运行。
Introduced the general situation of Bahrain Hydropower Project and the proposed DC high voltage transmission technology. It is estimated that by the end of August 2003, the power station in Pakon will be fully put into commercial operation.