论文部分内容阅读
2011年,神华集团有限责任公司(以下简称集团)发电本质安全体系研究课题通过验收,并在集团下属发电企业进行实施建设。经过检查评价,提炼出很多推行体系过程中的经验和亮点,同时也暴露出一些问题。问题集中在核心人员对本质安全体系建设的理解与认识不深刻,缺乏对实施本质安全体系手段、方法和重点的把握。如何在今后的电力安全管理中持续、深入地推进发电本质安全体系建设,将体系建设好、维护好、巩固好,使得发电安全生产有一个系统性的方法,最终实
In 2011, Shenhua Group Co., Ltd. (hereinafter referred to as the Group) Research on Intrinsic Safety System for Power Generation passed the inspection and was implemented in the power generation enterprises under the Group. After examination and evaluation, many experiences and highlights in the process of implementing the system have been extracted, and some problems have also been exposed. The problem is that the core personnel do not have a profound understanding and understanding of the construction of an intrinsically safe system and lack the grasp of the means, methods and priorities for implementing an intrinsically safe system. How to continue and deepen the construction of intrinsically safe power system in power generation in the future and establish a systematic approach to the safe production of power generation by building a good system, maintaining and consolidating it,