一、塔身施工图1为塔身支模示意。1.井架组装:为保证井架的稳定和垂直度,要做好井架基础,每接高十节要拉一道风缆绳。 2.双层吊盘组装:吊盘可根据塔身直径伸缩,上下两层吊盘的距离为2米,通过联杆将上下组成整体,如操作平台面积较大,可在四角加辐射梁,吊盘骨架均用 M16螺栓固定,操作平台铺板要紧密,周边设安全网。
First, the tower construction Figure 1 shows the tower body model. 1. Derrick assembly: In order to ensure the stability and verticality of the derrick, we must do a derrick foundation and pull a wind cable for every ten knots. 2.Double-layer hanging plate assembly: The hanging plate can be telescoped according to the diameter of the tower body. The distance between the upper and lower two-layer hanging plates is 2 meters. The upper and lower parts are integrated by the connecting rod. If the operating platform has a large area, radiation beams can be added in the four corners. The suspension frame is fixed with M16 bolts, and the operating platform must be closely plated with a safety net around it.