论文部分内容阅读
介绍了三峡二期围堰防渗墙风化砂柔性材料施工配方中水泥、风化砂和水的检测原理、检测步骤和检测结果。通过以上检测 ,有效控制了三峡二期围堰防渗墙的施工质量。
This paper introduces the testing principles, testing procedures and test results of cement, weathered sand and water in the construction formula of weathering sand flexible material for the anti-seepage wall of the second phase of the Three Gorges Project. Through the above tests, effectively control the construction of the Three Gorges Cofferdam cutoff wall construction.