二次设备在使用阶段的运行状态直接受其安装质量和调试质量的影响,所以,在安装和调试设备的全程中,工程师必须严格控制,正确地安装二次电气设备,使二次电气设备很好地服务于水电站电力系统。
The operating status of the secondary equipment during the use phase is directly affected by the quality of its installation and the quality of the commissioning. Therefore, during the entire installation and commissioning of the equipment, the engineer must strictly control and properly install the secondary electrical equipment so that the secondary electrical equipment is very Good service to the hydropower station power system.