通钢公司第二炼钢厂5号连铸机于1994年4月25日建成,一次试车成功,并于5月1日到20日进行了全连铸生产。现该机生产能力已达82万吨/年,基本具备了全连铸的生产条件。本文主要阐述了在全连铸和以往生产中所反映出的问题,对生产现场调度管理与转炉操作同连铸能力的合理衔接亦进行了分析。
Tonghua Iron and Steel Company No. 5 second continuous casting machine on April 25, 1994 built, a successful test, and in the May 1 to 20 were all continuous casting production. Now the aircraft production capacity has reached 820,000 tons / year, basically with all the continuous casting production conditions. This paper mainly expounds the problems reflected in the whole continuous casting and the previous production, and also analyzes the reasonable connection between the dispatching management of the production site and the operation of converter with the continuous casting.