火力发电厂大型循环泵总结会在长沙召开

来源 :化工给排水设计 | 被引量 : 0次 | 上传用户:myrost
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
由水电部电力规划设计院主持召开的《水利电力部“六五”期间开发电站循环泵总结座谈会》于86年7月20至24日在长沙举行。这次会议是在1980年召开的《大型循环泵系列型谱标准审查会》和1981年召开的《大型循环泵选型交流会》的基础上为进一步交流总结“六五”期间电厂大型循环泵的选型、设计、制造和安装运行各方面工作经验,提高电站水泵技术水平、适应“七五”期间电力建设的要求而召开的。 Hydropower Ministry of Electric Power Planning and Design Institute presided over by the Ministry of Electric Power, “Sixth Five-Year” period to develop circulating pump summary of the power station “on July 20, July 24 to 24 in Changsha. The meeting was held in 1980, ”Large Circulation Pump Series Spectrum Standards Review Conference“ held in 1981 and held in 1981, ”Large Circulation Pump Selection Exchange Conference,“ based on further exchanges and summarizes the ”Six Five“ during the large-scale circulating pump The selection, design, manufacture and installation work experience in all aspects of operation, improve the level of water pump technology to meet the requirements of the ”75" during the power construction held.
其他文献
教材作为提高教学质量的重要因素已受到愈来愈多的关注。在有限的时间内,如何运用教材提高学生的语言能力,一直是教学工作的基本目标。本文简述了在教学中教师应该如何以活动
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
一、数学模型不同闸坝的流量计算公式参考华东水利学院编的“水力学”上册(1979年版本)宽顶堰闸孔过水能力: 孔流界限;e/Hh_c″属淹没孔流 First, the mathematical model
六次上访市政府,十次走访商业局,五年亏损上百万,三年关门一千天;74名职工全部下岗,18名退休老人无所养,3名遗孀补助无着落;听到的是哀声、骂声,闻到的怨气、泄气;政界称为特
二 的 测 馒 计 施 工辊凝土坝温度缝间距计算方法探讨……’·’·’…·‘·’…·’··’…’·’……’·’………”’·张章法(1·9)水工大吨位预锚技术浅述……………
88年五座水电厂作了大坝安全鉴定.根据《水电站大坝安全管理暂行办法》的规定,1988年,有下列五座水电厂组织了大坝安全鉴定:古田、上犹江、新丰江、枫树坝、下苇(艹甸)。“D
本文采用水利工程界熟知的文克勒弹性地基梁解法,计算圆柱薄壳闸墙。除与闸柱连接的局部区域外,其余大部分壳体均属精确解。计算方法简便,且有表格备查,因之是一切实可行的计
如何教育不爱学习的孩子?截稿日期:10月20日。2016年第1期话题:发现学生早恋,班主任该怎么办?截稿日期:11月20日。来稿要求:1.文章立意新颖、紧扣话题、案例鲜活、题目自拟,
上个世纪60年代,法兰克福学派代表人物马尔库塞,在看到发达工业社会下个体人性的种种不自由和沉沦状态后,撰写了大量理论著作,对资本主义社会经济、政治、文化等多个领域展开
为执行中美地表水水文科技合作会议定书水文极值合作项目,经国家科委批准,水电部水文局与美国内政部地质调查局首次在我国南京联合召开了“中美双边水文极值学术讨论会”。