由水电部电力规划设计院主持召开的《水利电力部“六五”期间开发电站循环泵总结座谈会》于86年7月20至24日在长沙举行。这次会议是在1980年召开的《大型循环泵系列型谱标准审查会》和1981年召开的《大型循环泵选型交流会》的基础上为进一步交流总结“六五”期间电厂大型循环泵的选型、设计、制造和安装运行各方面工作经验,提高电站水泵技术水平、适应“七五”期间电力建设的要求而召开的。
Hydropower Ministry of Electric Power Planning and Design Institute presided over by the Ministry of Electric Power, “Sixth Five-Year” period to develop circulating pump summary of the power station “on July 20, July 24 to 24 in Changsha. The meeting was held in 1980, ”Large Circulation Pump Series Spectrum Standards Review Conference“ held in 1981 and held in 1981, ”Large Circulation Pump Selection Exchange Conference,“ based on further exchanges and summarizes the ”Six Five“ during the large-scale circulating pump The selection, design, manufacture and installation work experience in all aspects of operation, improve the level of water pump technology to meet the requirements of the ”75" during the power construction held.