论文部分内容阅读
1989年10月23日~25日,机车车辆工业总公司和机务局在大连机车车辆工厂召集会议,讨论了东风_4型机车电阻制动的问题。参加会议的单位有:大连机车车辆工厂、资阳内燃机车工厂、大同机车工厂、株洲电力机车研究所、永济电机工厂、西安铁路信号工厂、铁工指诛洲电机厂、铁道部驻大连、西安工厂验收室、铁道部科学研究院机辆所、绍兴特种工业瓷厂。会上,机车主机厂和配套厂、所介绍了一年来按铁工函[1989]15号部文要求组织制动电
October 23, 1989 ~ 25, Rolling Stock Industry General Corporation and the Bureau of Machine Building in Dalian locomotive factory convened a meeting to discuss the Dongfeng _4 locomotive resistance brake problem. The units attending the meeting are: Dalian Locomotive and Rolling Stock Plant, Ziyang Diesel Locomotive Factory, Datong Locomotive Factory, Zhuzhou Locomotive Research Institute, Yongji Electric Factory, Xi’an Railway Signal Factory, Tiezhi Zhubzhou Motor Factory, Ministry of Railways in Dalian, Xi’an Factory acceptance room, the Ministry of Railways Institute of Science and Technology, Shaoxing special industrial porcelain. At the meeting, locomotive OEMs and supporting plants, the introduction of a year by iron letter [1989] 15 text requirements of the organization of braking