论文部分内容阅读
由郑铁局建管中心西安工程指挥部组织的观音山相分段自动转换装置工程设备验交会于2001年10月19日在郑州铁路局西安科研所召开。参加会议的有西安铁路分局、机务分处、铁通公司、西安设计院。西安科研所、略阳供电段、宝鸡机务段等单位的20多位领导和科技人员。会议由西安工程指挥部孙宝乾同志主持,西安分局副局长胡晓波到会听取汇报并做了重要讲话,西安科研所和接收单位介绍了工程验
The construction of the Guanyin Mountain Phase Automatic Transfer Device Construction Equipment Inspection and Quarantine Bureau organized by the Engineering Command Division of Zheng Tiebu Construction Management Center was held on October 19, 2001 in Xi’an Scientific Research Institute of Zhengzhou Railway Bureau. Xi’an Railway Branch to participate in the meeting, the maintenance branch, Railcom, Xi’an Institute of Design. Xi’an Research Institute, Lueyang Power Supply Section, Baoji Locomotive Depot and other units of more than 20 leaders and scientific and technological personnel. The meeting was presided over by Comrade Sun Baoqian from Xi’an Engineering Headquarters and Hu Xiaobo, deputy director of Xi’an Branch, will hear the report and made an important speech. Xi’an Research Institute and the receiving organization introduced the project inspection