论文部分内容阅读
为了迎接今冬新的水利高潮的到来,区水利电力厅在9月19至22日召开了专区水利电力局长以及机械排灌、灌溉管理干部会议,检查了前一阶段蓄水、保水和抽水机安装情况,研究了当前大办水利的新形势和做好大动工前的一切准备工作。会议首先肯定大跃进以来我区兴修水利取得的伟大成就。1958年以来,我区农田水利建设,在党的领导下,做了前人没有做、也不可能做到的事。以灌溉万亩以上的骨干工程来说,全区现在就有251处,其中的157处是大跃进的1958年和继续跃进的去冬今春完成的。贵县平龙水库、武思江水库、上林大龙洞水
In order to welcome the arrival of the new water conservancy this winter, the District Water Resources and Electric Power Department held a meeting of the Director of the Water Conservancy and Electric Power and the meeting of mechanical irrigation and irrigation management cadres from September 19 to 22, checking the previous stage of water storage, water conservation, and installation of the pump. Researched the new situation of the current large-scale water conservancy and all the preparatory work before the major construction. The meeting first affirmed the great achievements made by our district since the Great Leap Forward. Since 1958, under the leadership of the Party, the irrigation and water conservancy construction in our region has done nothing that our predecessors did or could not do. With regard to the key projects for irrigation of more than 10,000 mu, there are now 251 in the region, of which 157 were completed in 1958 and continued to spring into the winter and spring of the Great Leap Forward. Guixian Pinglong Reservoir, Wusijiang Reservoir, Shanglin Dalongdong Water