榆林市供电公司调度中心的前身也仅仅是一个通信班,2000年成立了调度中心,先后设置了通信班,自动化班,调度班和远动班,当时最高负荷也不超过10兆瓦。几年来,随着电网的不断迅速发展壮大,逐步形成以6条330千伏线路为龙头,15条110千伏线路为骨架,35千伏和10千伏线路为脉络的电网结构,最高负荷达到1103.58兆瓦。供电能力和供电可靠性大幅增强,2010年还承担了国家重点项目包西和太中银铁路项目(供电线路长800多公里)的供电任务,这就要求调度中心不仅要具备管
Yulin City, the predecessor of the power supply company dispatch center is just a communication class, in 2000 set up a dispatch center, has set up communication classes, automation classes, scheduling classes and remote classes, when the maximum load does not exceed 10 megawatts. Over the past few years, with the continuous rapid development and expansion of the power grid, a power grid structure gradually formed with six 330-kilovolt lines as the backbone, 15 110-kilovolt lines as the skeleton, 35-kilovolt and 10-kilovolt lines and the maximum load reached 1103.58 MW. Power supply capacity and reliability of power supply have been greatly enhanced. In 2010, it also undertook the power supply tasks of the national key projects including the Baixi Railway and the Taizhongyin Railway Project (over 800 km of power supply lines), which required the dispatching center not only to have the pipe