论文部分内容阅读
本文介绍了乌鞘岭隧道右线YK2390+717塌方的情况,对塌方的原因进行了分析,提出了塌方处理方案,通过监控量测结果表明,塌方处理方案可行。
This paper introduces the situation of YK2390 + 717 landslide on the right line of Wushaoling tunnel, analyzes the causes of landslides, and proposes the landslide treatment plan. The monitoring and measuring results show that the landslide treatment plan is feasible.