下花园电厂四期灰场灰渣筑坝设计与施工的研究河北省电力勘测设计院(050031·石家庄)朱艳琴下花园电厂现装机容量480MW,年排灰量31.5×104t,贮灰场位于距电厂4km的马圈沟内。一、二、三期坝分别于1975、1988、1991年动工兴建,并于...
Study on the design and construction of the ash slag dam for the fourth phase of Xiahuayuan Power Plant Hebei Province Electric Power Survey and Design Institute (050031·Shijiazhuang) Zhu Yanqin Xiahuayuan Power Plant has an installed capacity of 480MW and an annual ash discharge of 31.5×104t. The ash storage yard is located at 4km from the power plant in the horse ditch. The first, second and third stage dams were built in 1975, 1988 and 1991 respectively, and were built in...