近几十年来,随着高速铁路建设的快速发展,大体积现浇简支箱梁在铁路桥梁中的应用不断增加,促进了现浇混凝土简支箱梁施工工法的不断完善和成熟。最常用的有移动模架施工和支架施工。支架施工适用于低墩,施工主要内容包括地基工程,支架工程,模板工程,钢筋混凝土工程,预应力钢筋工程等。施工工艺流程如下:地基处理→脚手架搭设与预压→底模与侧模安装→绑扎梁体底腹板钢筋→安装底腹板预应力波纹管→安装内模→安装端模→绑扎顶板钢筋→安装顶板预应力波纹管→梁体混凝土灌注→养护→脱侧模→张拉→压浆→撤支架和底模。
In recent decades, with the rapid development of high-speed railway construction, the application of bulky cast-in-place box girders in railway bridges has been increasing constantly, which has promoted the continuous improvement and maturation of the construction method of cast-in-place concrete box girders. The most commonly used mobile formwork construction and stent construction. The construction of scaffolding is suitable for low piers. The main contents of construction include foundation engineering, scaffold engineering, formwork engineering, reinforced concrete engineering and prestressed reinforced concrete engineering. Construction process is as follows: Foundation treatment → scaffold erection and preloading → Bottom mold and side mold installation → Binding beam bottom web steel bar → Install bottom web prestressed bellows → Install inner mold → Install end mold → Lashing roof reinforcement → Installation of prestressed corrugated pipe roof → concrete pouring → curing → off-side mode → tension → grout → withdraw the bracket and the bottom mold.