The China Advanced Research Reactor (CARR) is scheduled to be operated in the autumn of 2008.In this paper,we report preparations for installing the neutron rad
The high accuracy DC power supply has a wide application in the accelerator field. A majority of power supplies applied to magnets are in the category of high a