招标控制价是招标工程限定的最高工程造价,它是以国家或省级建设部门颁发的计价办法为依据,按照施工设计图纸计算得出的。招标文件中明文规定,如果投标者的报价在一定程度上超过了文件中所公布的招标控制价,那么这一投标就无任何意义,并视其为作废。对于招标控制价自身来说,它能有效地杜绝或避免投标入串标、哄抬标价现象的出现。但有很多建设单位由于没有建设经验,常常会认为工程控制价是工程造价咨询单位所肩负的职责,所以对拟建的工程图纸不加以了解。此外,建设单位对那些需要专业分包甩项的以及需要予以提供暂定价的主要材料或甲方的供材也置之不理,全部推给工程造价咨询单位去做,这就使得建设单位不能根据拟建工程的实际投资额对招标控制价中所包含的内容加以把握
The bidding control price is the maximum project cost limited by the bidding project. It is based on the pricing method issued by the state or provincial construction department and calculated according to the construction design drawings. The bidding documents expressly state that if the bidder’s quotation to some extent exceeds the bidding price as published in the document, the bid will be of no significance and will be regarded as invalid. For the bidding control price itself, it can effectively eliminate or avoid bidding into the serial standard, bidding up the emergence of the phenomenon of price. However, many construction units, because they do not have construction experience, often think that the project control price is the responsibility of the construction cost consultation unit, so they do not understand the proposed construction drawings. In addition, the construction unit for those who need professional sub-rejection items and the need to provide temporary price of the main material or Party A’s supply of materials are ignored, all pushed to the project cost consulting unit to do, which makes the construction unit can not be proposed The actual amount of investment in the project control the price contained in the grasp