论文部分内容阅读
结合金塘大桥60 m预制箱梁的结构和施工环境特点,介绍了箱梁移运技术。
Combined with the structure and construction environment of the 60 m prefabricated box girder of Jintang Bridge, the box girder moving technology is introduced.