论文部分内容阅读
桥梁施工过程中出现缺陷难以避免,处理方法多种多样,但必须因地制宜,以经济、技术可靠为原则,文中提及了预应力T构箱梁湿接缝爆裂及桩基嵌岩深度不足等问题的处理。
Defects in bridge construction process are difficult to avoid. There are many ways to deal with these problems. However, due to local conditions and economic and technical reliability, the paper mentions the problems such as the burst of wet joints and the lack of socketed depth of prestressed T-beams Processing.