武钢初轧厂均热跨的轨道大梁,是参照苏联Π-4型图纸制造的铆接结构,于1960年11月投产使用,至今已有28个多年头,上设有4台起重量320t至340t的钳式吊车,每天起吊往返的初轧钢坯在8000t以上,使轨道大梁承受着多种交变荷载。1988年1月中旬,我们对西起第12柱至第13柱间发现的一处轨道大梁下弦断裂部位进行了修复处理,采用了船状箱体构件补强,效果很好,较好地缩短了检修工期。该处轨道大梁断裂部位是发生在下弦铆接的角钢上,由于检修工期紧,来不及折除和对断口进行全面观测与检查,只能从断裂表面的弯曲走向进行
The thermal girders of Wuhan Iron and Steel Co., Ltd.’s primary rolling mill are made of riveted structures manufactured in accordance with the Soviet model Π-4 drawings. They were commissioned in November 1960 and have been used for 28 years. There are 4 sets of lifting capacity 320t to 340t. The clamp-type crane lifts more than 8,000 tons of green-rolled steel billets each day, so that the rail girder bears a variety of alternating loads. In mid-January of 1988, we repaired a fractured part of the lower girder found between the 12th column and the 13th column in the west. We used the reinforcement of the ship-shaped box members and the effect was very good. The maintenance period. The location of the rail girder breakage occurred on the angled riveted angle steel. Due to the tight repair schedule, there was no time to dismantle and perform a complete observation and inspection of the fracture, and only from the curved surface of the fracture surface.