论文部分内容阅读
从普恰克其乡家依闸口东支渠实际情况出发,对支渠渠道冻胀问题的设计进行分析,并对预控措施进行探讨。
Based on the actual situation of Puzhikan countryside at the gate east branch canal, the design of branch canal channel frost heaving problem is analyzed, and the pre-control measures are discussed.