一、工程概况长庆油田地处黄土冲积高原,地貌特点是沟多、沟大、沟深、坡陡,给油田地面建设工程带来很多不便。在长庆马岭油田中二区产能建设中,从南端202转油站至北端201转油站,有四根φ60—89毫米油气管线需悬吊跨越宽250米、垂直深度近100米的陡沟。设计上按悬缆结构,需配主索6×19—φ34.5毫米平行固定钢丝绳两组每组2根,6×19—φ24.5毫米钢丝绳安装索1根。管线净重5.88吨,整体重量24.5吨(包括管重、保温、吊索、吊架等);主锚及支架墩各2个,风锚及防震锚共6个。工程施工立面如图1。
First, the project profile Changqing Oil Field is located in the alluvial loess plateau, topography is characterized by more ditch, ditch, ditch deep, steep slopes, to the oil field construction of the ground a lot of inconvenience. Changqing Maling Oilfield in the second district production capacity construction, from the southern end of 202 gas stations to the northern end of 201 gas stations, there are four φ60-89 mm oil and gas pipelines to be suspended across a width of 250 meters, the vertical depth of nearly 100 meters steep ditch. Design according to the suspension cable structure, with the main cable 6 × 19-φ34.5 mm parallel fixed rope two groups of two, 6 × 19-φ24.5 mm rope installation of a cable. Pipeline net weight 5.88 tons, the overall weight of 24.5 tons (including pipe weight, insulation, sling, hanger, etc.); the main anchor and bracket pier each 2, wind anchor and shock anchor a total of six. Engineering construction facade shown in Figure 1.