论文部分内容阅读
20 0 1年 4月 12日~ 4月 15日 ,应用外掺MgO砼不分横缝快速筑拱坝技术仿真计算研究会议在广东省水利水电科学研究所召开。参加会议的有清华大学土木水电学院、武汉大学土木建筑工程学院、广东省水利厅、广东省水利水电勘测设计研究院、广州市水利水电勘测设计研究院、广东
April 20, 2001 to April 15, the application of MgO concrete without lateral joint fast arch dam technology simulation research meeting held in Guangdong Institute of Water Conservancy and Hydropower. Participants at the conference included: School of Civil Engineering and Hydropower, Tsinghua University, School of Civil Engineering and Architecture, Wuhan University, Guangdong Provincial Department of Water Resources, Guangdong Provincial Institute of Water Resources and Hydropower Survey and Design, Guangzhou Water Conservancy and Hydropower Survey and Design Institute, Guangdong