三峡二期工程混凝土施工按季节、部位(浇筑区)、结构部位等的不同,对拌和系统出料口温度的要求不同。其温度控制要求严,各级骨料降温幅度大,因此采用了最先进的二次风冷骨料与加片冰及加冷水拌和生产工艺。通过对温控生产要素的不断优化管理,以及混凝土温控技术的不断提高,不仅很好地满足了混凝土生产的质量与进度要求,同时也较好地处理了生产成本与进度的关系,最大程度地发挥了混凝土拌和系统的生产能力。
The construction of the Three Gorges Project of the second phase of the concrete according to the season, the site (pouring area), the different parts of the structure of the mixing system outlet temperature requirements. The temperature control requirements, all levels of aggregate cooling rate, so the use of the most advanced secondary air-cooled aggregate and add ice and cold water mixing production process. Through continuous optimization of temperature control factors, as well as continuous improvement of concrete temperature control technology, not only well meet the quality and progress of concrete production requirements, but also better handle the relationship between production costs and progress, the maximum extent To play a concrete mixing system of production capacity.